Monday, February 15, 2010

The Bathrooms

We started by ripping everything out of the bathrooms (cabinets, toilet, and existing vinyl). Below are pictures of our master bathroom.

With just backerboard:

Midway through tile installation:

With tile installed:
 

We should have the toilet, cabinets, and trim back in in the next day or so after we paint.

No comments: