We started by ripping everything out of the bathrooms (cabinets, toilet, and existing vinyl). Below are pictures of our master bathroom.
With just backerboard:
Midway through tile installation:
With tile installed:
We should have the toilet, cabinets, and trim back in in the next day or so after we paint.
No comments:
Post a Comment